Part A: 29 kb
Showing all 3 results
-
A New Arena
8,00 $ – 50,00 $CASE STUDY. Two neighbouring cities want to build a new arena and each City Council has the choice of building its own arena or developing a shared project with the neighbouring city.
-
T.E.K.: Development of a Change Project
8,00 $ – 50,00 $CASE STUDY. A small plant, owned by a multinational is experiencing difficulties. Operating costs are high and local management is having trouble in identifying problems.
-
Un nouvel aréna
8,00 $ – 50,00 $ÉTUDE DE CAS. Les élus de deux municipalités voisines ont le choix de construire leur aréna propre ou de se mettre ensemble pour une construction commune.
Showing all 3 results